Thursday, May 23, 2013

Framing!

It's been three weeks since I last posted and as I was going through all the photos, getting them ready to write the blog I realized just how much we've gotten done! This has been a very exciting phase as all of a sudden (well maybe not so sudden) we have ROOMS.  I really expected the house to start feeling smaller but the opposite seems to have happened.  It feels very roomy and open - still!

Neither Rick or I had really ever done any framing so we spent a lot of time reading books and looking up You Tube videos online. (I'm not sure how we would have gotten as far as we have without You Tube and the internet!) But at some point we had to start.

But first I had to finish the adobe wall between the bedroom and sunspace.

That done, it was on to the framing.

First thing was to haul the wood inside.

Then we had to install the sill plates on all the footings.  
Here you see the sill plates going in on the studio wall.

Office wall

Pantry, bath and bedroom

First stud installed (by a stud <G>)  The 2 x 6s that we're using are 14 feet long.  This was not quite long enough and we had to attach another piece so it would reach all the way!
First section done.

Framing in the door.

Office wall done.  There will be a lovely French door installed here.
First studs up for the wall between the studio and living room.

Corner turned.

This is the wall separating the studio from the hallway.  Rick had work work he had to do so I framed this wall all by myself!  Fun!!

As you can see, the ceiling will be very high!  (It will eventually be covered with aspen T&G.) The wall between the hall and studio will go all the way up, too, but first we need to install the floor to the storage space. There will be vigas that will span from the bond beam to the short wall and will stick out about 18".  Should look really nice!

A glass artist friend of ours in San Diego gave us this window that she made.  There's a pane missing (which she is in the process of replacing) but we think it will look really lovely.  This will let more light into the hall. We have been carrying this window around with us for almost 13 years!  It's nice to finally have a home for it.

Ready for phase II

When we first moved to Youngsville almost 9 years ago one of our neighbors gave us a bunch of vigas that came out of a log cabin he had disassembled in the village.  We are using them to construct the ceilings here and in the studio but decided we also wanted one at the corner of the kitchen.

Another salvaged piece of wood that we've had hanging around for a number of years was this 6x6. It makes for a perfect beam over the adobe wall in the bedroom.


Phase II


Sunspace wall framed.

Kitchen wall framed.  That piece of viga hanging out in mid air on top of the wall is there so we can see what it will look like once all the vigas are up. The ceiling will go on top of the vigas.

We needed a way to attach the framed walls to the straw bale walls.  This is what we came up with: 2x2s  pounded into the straw to which the stud is then attached.

Walls are framed and the final top plate is going up.

Looking toward the living space from the door to the garage.

So here you have it -
Office

Studio

Pantry! (Can't wait!!)

Bath - this is an L shaped room. I'm standing in the hall looking toward where the shower will be.

Bedroom

This will be our view from the bed.

Bird's eye view from the dinning room looking first east (on the left) and then south toward the studio.

Speaking of birds. We have had a number of birds join us in the house.  One morning I got there and two morning doves flew out! We also had a humming bird visit. But the most fun has been a pair of swallows. They have been hanging out and singing to me almost daily. 

Vigas

Phase III will be the instillation of the vigas over the studio and bath/bedroom area onto which the floor will be built. These vigas are big and heavy! So we've started moving them from where we've had them stored for almost 9 years to the house - a couple at a time. Getting them up will be a challenge but we think we've figured out how to do it.

Starting to off load the first two vigas.

No telling how old this wood is but you can be sure it came from close by. The growth rings are VERY narrow and close together signifying that this tree grew in an area where there is not much rain and slow growth.  
Even after many years, this wood is still very solid!

Stay tuned!









Wednesday, May 1, 2013

A Lot of This and That

While we waited for warmer weather so we could pour cement, we've been doing a lot of this and that.

Garage

The first thing we did was get a lot done on the garage. Openings for windows and door had to be cut.

Then the OSB had to be covered.

Rick had to build windows.  Windows had to then be installed

Rick's beautiful door.   Door installed.

Straw bales installed.


Power Shed

There will be a shed attached to the north side of the house which will hold all the batteries for our solar system. It was now time to dig that footing and get it ready for cement.


Plumbing

With the weather warming up and footings all dug and in place it was time to get the plumbing roughed in.



Cement

Plumbing rough done and inspected.  Weather warming up. Time to pour footings! Our electrician borrowed a gas powered cement mixture and he and a friend came and helped us. I felt we could get it all done in a day but, with Samuel and Antonio's help, we got it done in a morning!
Samuel and Antonio preparing the first batch of cement.

First footing done!

My job was to screed the cement smooth.

Footings poured!

Forms removed!

First wall!

With the footings poured and dry, it was time - finally - to start putting up the inside walls. We started with the wall that separates the bedroom from the sun space. It will be a 36" adobe wall so that the bedroom will be open to the sunspace. Once again we're using another piece of the old highway bridge to frame the doorway.
Lucy's helping us get ready to put up the big post.

Post up!

First adobes ready for instillation.  It's been over a year since I did the trombe walls and it took me a little time to remember how to mix the mud.

After the first's days work.

Four courses done!  Half way there.

Next

Our next big project is to finish framing all the inside wall so that the electrician and plumber can finish the rough-ins. I've never done framing so this will be another learning experience. We hope to get started on the first wall in the next few days.  Until then, I will continue laying adobes.






Tuesday, April 2, 2013

Like Making a Casserole


"I can't believe what you guys are doing!" 
"I am so in awe of your building your own home." 
"You never cease to amaze me . . ." 
"You guys are awesome!"  
"You're amazing!"

Now I don't think I've ever been called amazing before but I get that a lot lately. And it has been food for thought.  While we ARE amazed at what we are doing, we don't feel amazing. It IS amazing to wake up in the morning and look out the window at our house that we're building! (This time last year we had just started putting up the framing.)

But do I FEEL amazing? No. I just feel like someone who has had a dream, researched how to make that dream come true and has taken the steps to make it happen.

It's a lot like making a casserole. Or designing a sweater. Or sewing an outfit.  Or building a model railroad. You decide what it is you want to make. You make a "parts" list. You define the steps and in what order. Then you start with step one and take it one step at a time from there. Really! It's that simple!!! And that's what we've done.

About 6 or 7 years ago I singed up for and took a number of adobe building classes at a local collage. We are fortunate to have one of the most knowledgable adobe builders in the US in our little community (Quentin Wilson).  One of the many things I learned from him is that building a house is not rocket science. He really helped demystify the whole process for me.  And gave me the opportunity to experience the process first hand.  While I've been around builders all my life, before I took those classes I had never really used a power tool! Now I think I'm pretty handy with all the power tools we have!

He also impressed up us the thought that we should always be willing to ask for help. While we've done most of the work ourselves we have had the help of wonderful friends when we've needed it.  That's been a lifesaver!!!!

What I'm trying to say, I guess, is that we're really not that special or "amazing". We're just doing what folks have done since the beginning of time. We're building a house to live in!  It's exciting, it's challenging and it's stimulating! But it's not rocket science! It just takes the willingness to say "what the hell" and take that first step.

We may not be amazing but this experience sure has been! And continues to be!  What a ride!!!!!

And at the end of this ride we'll have a wonderful house in which to live, work and play!

Amazing!

Friday, March 29, 2013

Continuing Inward

When last I wrote, we had just finished putting up stakes and strings for the inside walls for the bedroom, bath and pantry.  I've spent the last three weeks trenching and building forms.

First trenching done.  

Forms in place. They only go so far because trenching for the plumbing needs to be done before the rest of the forms can be put in place.
This pictures shows the footing where the three foot high adobe wall separating the sun space from the bedroom will go.  There will be a wooden post at the end of the adobe wall that will go up to the ceiling.  The post will be some more wood from the old bridge. There will be an opening into the bedroom but no door.

Here you can see the trenching I've done for the plumbing.  The shallower trench on the left is for the cold water from the pressure tank that will be in the garage.  Hot water will also go in this trench from the on-demand hot water heater in the bathroom back to the washer in the garage and forward toward the kitchen. I know this trench looks shallow but there will be maybe 6 more inches of dirt for the floor once the trench is filled in.

The deep trench toward the back of the picture is for the gray water.
The closer deep trench is for the black water.

Trenching done I can now finish the forms.
Forms are completed and rebar is in place.

The biggest challenge here has been dirt management.  The soil is very dry and loose and I had to be careful where I put it. More than once I realized that I had piled dirt over a spot where I was going to have to trench. Often I would add to the pile only to have it roll down the mound back into the trench! Thought about running a hose into the house to wet down the dirt but with all that exposed straw, I felt that would be tempting fate. We will just have to live with the loose soil until we can refill all the trenching - after the plumbing is installed - and the concrete footings are poured.

We are currently waiting for an estimate on the plumbing.  We have to have a certified plumber install the propane line but we have always thought we'd do the rest of the plumbing ourselves.  We decided to see just how much it would cost to have the guy doing the gas line do the plumbing, too. We'll see. We may end up doing the plumbing anyway. We cannot pour the footings until the plumbing is roughed in and we cannot build the walls until the footings are poured so we are in a bit of a holding pattern.

While we're waiting for the plumbing to be resolved we have moved back into the garage to finish the east end.  We will be installing two non-opening windows plus a small access door. Quite a while back, we picked up some double pane windows at the Habitat Re-Store and this past week Rick built frames for them.
They have been stained red and look really nice.

This is where one of the windows will go.
This picture shows the two windows with the access door in the middle. Straw bales will be stacked on this wall once the windows are installed. The outside will then be covered with underlayment like we did on the roof and corrugated siding. Should look pretty cool.







Sunday, March 10, 2013

Onward & Inward

Days are starting to warm up but work continues inside.  We have done just about all the bale stacking we can for the time being.  The last we did was above the adobe wall.

We still have to stack bales at the end of the garage but Rick must make some windows and a door for the wall above the garage doors that will allow us to store wood in the "attic" before we can get to that so it's on to digging the footings and making forms for the inside walls.


I decided to start with the wall between the office and studio as it was the least complex. Here you see that the ditch has been dug and the first form board installed.  The footings will be 8" deep and 8" wide so I had to first set a string at the height of the grade beam. Then I dug down to give the depth that I needed.  Then, using the string as a guide, I started setting the forms.  The notch on the left is the step-down for the door into the office.

Here the form is finished and the rebar is in place.

Then it was on to the wall between the studio and the rest of the house.  This was a bit more difficult as there is a diagonal. The wood for the forms needed to be cut so that we'd have a nice, sharp edge where the diagonal meets the other two walls.

Here you can see the strings that have been laid out.  The wood is there so that I didn't trip over the strings.  It sort of helped <g>


Forms are done.

Our new fur-baby, Lucy, checks it out.

A detail showing the rebar.

Bird's eye view (and we've had birds in the house!)

Since our floors are going to be earthen, while digging the footings, we also have to trench for the propane and water.
Here you can see two PVC sleeves - one for the water and one for the propane.  We will have a sink in the studio with an on-demand hot water heater plus a small propane back-up heater in the office.

This is just to the right of the photo above.  This trench will follow the wall around the perimeter of the living room to the kitchen, bath and under the bedroom to the water pressure tank in the garage. Trenching will also have to be done for the black-water drain. All of the plumbing will have to be roughed in before the footings can be poured.

Next is on to staking the walls for the bedroom, bath and pantry. But first the space needed to be cleared out.
In order to get the level of the top of the footings the same height as the grade beam, Rick got to use his nifty laser level.

There have been many times over the last year and a half where we have marked out these walls - just to get a sense of what the spaces were going to "feel" like.  This time it's for real! We have done some futzing with the room sizes and wall locations and finally feel we have them the way we want them. (If you click on the picture you will get a bigger version of it that will allow you to see the words marking the rooms.) The wall between the bedroom and the sunspace on the right (where Rick is walking) will only be a 3 foot high adobe wall so the bedroom will be open to the sunspace.  It will be nice!

Good progress is being made and if we can get the plumbing in and inspected soon, we will be right on course to pour the concrete footings as soon as the nights warm up.